Distribution shed, Team Valley
Main contractor, design and build
Portal frame on a live site with a 6 m crane oversail restriction. Erected in four phases around the existing yard.
Projects
A sample from the last two years across Newcastle and the North East, 630 tonnes in total. Tonnage and programme are on every card because that is what gets asked on the first phone call.
Main contractor, design and build
Portal frame on a live site with a 6 m crane oversail restriction. Erected in four phases around the existing yard.
Architect-led refurbishment
Three-storey feature stair in dressed mild steel, welds ground flush, oak treads by others. Site survey to 2 mm.
Local authority framework
Two-storey braced frame with long-span cellular beams over the hall. Delivered in term-time, night deliveries only.
InfrastructureCivils contractor
Fabricated plate girders with a weathering steel parapet. Full NDT on the butt welds, third-party inspected.
Food manufacturer
1,400 m² mezzanine at 7.5 kN/m² over a working chill line. Installed across four weekend shutdowns.
IndustrialMarine engineering works
Cracked crane rail brackets cut out and replaced by coded welders working nights, crane back in service each morning.
Working with us
They price properly, they tell you early when a drawing does not work, and the steel turns up in the order we asked for. That is most of my job done.
Project manager, Regional main contractor, Sunderland
Their detailer picks up connection queries before we do. The approval drawings come back clean, which saves us a fortnight on a typical frame.
Structural engineer, Consultancy, Newcastle
Cracked gantry brackets on the Friday, coded welders on site Sunday night, crane running Monday morning. No fuss.
Maintenance manager, Manufacturing site, North Tyneside
Send the GA drawings and a section schedule. You will have a rate per tonne in three working days.